Burnley · Lancashire · 20 year warranty
CladPro Cladding Spraying logo07497 226 956

Cladding spraying in Burnley

Industrial and commercial cladding spraying across Burnley \u2014 from Shuttleworth Mead and Network 65 to units on Heasandford and Rossendale Road. Tired, chalky cladding resprayed in place, usually inside two days.

  • • On-site spraying, no downtime for your building
  • • Any RAL colour, colour matched on site
  • • 20 year warranty on two-pack industrial coatings
  • • Same-day price from Joe Tattersall
Free, no-obligation quote0% complete
What needs spraying?

Helpful: condition, desired colour/RAL, building height, access and whether you're operational during works.

0/2000

Up to 6 photos of the cladding or site, 10MB each — the fastest way to an accurate price.

No obligation. Your details go straight to Joe Tattersall — never shared.

Before & after

Drag the slider to see the difference on units we have sprayed.

Industrial unit cladding respray — afterAfter
Industrial unit cladding respray — beforeBefore

Weathered elevations restored in dark grey.

Industrial shed cladding respray — afterAfter
Industrial shed cladding respray — beforeBefore

Faded cream shed resprayed to a matte finish.

What we spray in Burnley

Cladding elevations

Full respray of profiled metal cladding in any RAL colour, sprayed in place.

Cut edge corrosion

Rusting sheet edges and laps stripped, treated and sealed before topcoat.

Roller shutters & doors

Loading bay shutters, dock doors and surrounds finished to match.

Gutters, trims & fascias

Barge boards, corner trims and gutter lines done with the elevation.

Roof sheets

Roof coating systems applied by trained rope access and MEWP teams.

Structural steel

Internal and external steelwork, including intumescent systems.

Areas we cover around Burnley

  • Burnley
  • Padiham
  • Nelson
  • Brierfield
  • Colne
  • Accrington
  • Rossendale
  • Todmorden
  • Hapton
  • Rose Grove

How a Burnley cladding respray runs

The same seven stages on every job, whether it is a single unit or a full Lancashire estate.

  1. 1. Survey

    We measure elevations, check the condition of the existing coating and agree access before quoting.

  2. 2. Access

    MEWPs, scissor lifts or rope access, planned around your deliveries and trading hours.

  3. 3. Clean

    Elevations pressure washed and degreased so the new coating bonds properly.

  4. 4. Repair

    Cut edge corrosion treated, laps sealed and any failed sheet coating stripped back.

  5. 5. Mask

    Windows, signage, vehicles and neighbouring units screened to control overspray.

  6. 6. Spray

    Two-pack industrial coating applied by airless spray in your chosen RAL colour.

  7. 7. Sign-off

    Walk round with you, snag anything outstanding and issue the 20 year warranty.

What cladding spraying costs in Burnley

Every building is priced individually — these are the four things that move the number up or down. Send sizes or photos and Joe Tattersall will normally price it the same working day.

Elevation area

Priced by square metre of cladding, roof sheet and trim, not by guesswork.

Condition

Sound panels only need cleaning and topcoat; heavy cut edge corrosion adds prep time.

Access

Open yards are quickest; tight service yards, live loading bays or roof work cost more.

Colour & coats

Big colour changes, or bright and metallic RALs, can need an extra coat.

Also available: commercial cladding spraying and intumescent spraying nationwide.

Cladding spraying contractors in Burnley

Burnley's industrial stock is dominated by 1980s and 1990s steel-framed units on Network 65, Shuttleworth Mead and the Heasandford estate. The original PVF2 factory coating on those buildings is now well past its design life, so elevations chalk, fade and streak long before there is anything wrong with the sheet itself. Spraying on site restores the finish for a fraction of the cost of recladding, with no scaffolding bill and no shutdown.

We work off MEWPs on the open yards around Rossendale Road and use rope access where units back onto the canal or sit tight to a boundary. Every elevation is jet washed, degreased and abraded, cut edges and laps are treated, then two coats of two-pack industrial coating are sprayed to your chosen RAL. A typical single-elevation Burnley unit is off the programme in about two days.

Because we are based in Rossendale, Burnley is a twenty minute run for us. Joe Tattersall can usually get on site to measure the same week, and smaller jobs often get slotted in around larger contracts, which keeps the price down.

Recent work near Burnley

Distribution unit, Network 65

1,800 m² of profiled cladding resprayed RAL 7016 over two days, unit trading throughout.

Engineering works, Heasandford

Cut edge corrosion stripped and sealed on north elevation before a full two-pack topcoat.

Trade counter, Trafalgar Street

Roller shutters, gutter line and fascia panels colour matched to the client's brand grey.

Burnley cladding spraying FAQs

Do you spray cladding in Burnley?
Yes. We spray cladding on industrial, commercial and retail buildings throughout Burnley and the wider Lancashire area, working on site with MEWP and rope access teams.
How much does cladding spraying cost in Burnley?
Price depends on the elevation area, condition of the existing coating and access. Send sizes or photos and Joe Tattersall will normally come back with a price the same working day.
How long does the finish last?
We use two-pack industrial coatings and back every project with a 20 year warranty.