Warehouse, Wingates Industrial Estate
Elevations and roof trims resprayed RAL 7016, unit stayed open throughout the works.
07497 226 956Cladding spraying contractors covering Bolton and the surrounding towns \u2014 units at Wingates, Middlebrook, Lostock and Farnworth resprayed on site in any corporate colour.
Drag the slider to see the difference on units we have sprayed.
After
BeforeWeathered elevations restored in dark grey.
After
BeforeFaded cream shed resprayed to a matte finish.
Full respray of profiled metal cladding in any RAL colour, sprayed in place.
Rusting sheet edges and laps stripped, treated and sealed before topcoat.
Loading bay shutters, dock doors and surrounds finished to match.
Barge boards, corner trims and gutter lines done with the elevation.
Roof coating systems applied by trained rope access and MEWP teams.
Internal and external steelwork, including intumescent systems.
The same seven stages on every job, whether it is a single unit or a full Greater Manchester estate.
We measure elevations, check the condition of the existing coating and agree access before quoting.
MEWPs, scissor lifts or rope access, planned around your deliveries and trading hours.
Elevations pressure washed and degreased so the new coating bonds properly.
Cut edge corrosion treated, laps sealed and any failed sheet coating stripped back.
Windows, signage, vehicles and neighbouring units screened to control overspray.
Two-pack industrial coating applied by airless spray in your chosen RAL colour.
Walk round with you, snag anything outstanding and issue the 20 year warranty.
Every building is priced individually — these are the four things that move the number up or down. Send sizes or photos and Joe Tattersall will normally price it the same working day.
Priced by square metre of cladding, roof sheet and trim, not by guesswork.
Sound panels only need cleaning and topcoat; heavy cut edge corrosion adds prep time.
Open yards are quickest; tight service yards, live loading bays or roof work cost more.
Big colour changes, or bright and metallic RALs, can need an extra coat.
Also available: commercial cladding spraying and intumescent spraying nationwide.
Bolton's newer warehousing at Wingates and Middlebrook sits alongside a lot of older stock in Lostock and Farnworth, and the two age very differently. The newer estates usually just need the factory coating restored; older units around Farnworth tend to have real cut edge corrosion, blown laps and failed gutter lines that have to be dealt with before any topcoat goes on.
Our survey covers the whole envelope, not just the paint — sheet condition, fixings, gutter joints and any water tracking behind the cladding. If something needs repair rather than coating we say so up front, because spraying over a live problem only hides it for a season.
Bolton is a short run from our Rossendale base, so mobilisation is quick and we can work weekends where units at Middlebrook or Wingates cannot lose a trading day. Any RAL colour, sprayed in place, 20 year warranty.
Elevations and roof trims resprayed RAL 7016, unit stayed open throughout the works.
Extensive cut edge corrosion stripped, treated and sealed, then a two-pack topcoat.
Weekend works to avoid trading days, shutters and trims colour matched to brand grey.